PENSILINE
MONZA

Year of realisation:

2025 - 2026

Surface area:

Covered area 1.600 sqm

Description:

Construction of a cantilevered canopy.
Structural framework treated with intumescent coating for R120 fire resistance, with rock wool roofing panels.
Canopy edge finished with Alucobond panels.
Suspended ceiling with aluminum slats.

Gallery